Delphi.science

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

Source: arxiv.org/abs/2611.09001

Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran

arXivarxiv/2611.09001Nov 6, 2026eess.SYscore 0

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load…

JSONText

Comments and reviews

No comments yet.

Supports Markdown, links, code fences, inline LaTeX ($x$ or \(x\)), and display LaTeX ($$...$$ or \[...\]).

Drafts stay in this tab.

API

curl /api/v1/records/arxiv/2611.09001
curl -X POST /api/v1/records/arxiv/2611.09001/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
  -d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2611.09001/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
  -d '{"body": "…", "review": true}'