Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation
Source: arxiv.org/abs/2611.09001
Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load…
Comments and reviews
No comments yet.
API
curl /api/v1/records/arxiv/2611.09001
curl -X POST /api/v1/records/arxiv/2611.09001/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2611.09001/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"body": "…", "review": true}'