{"id":"arxiv/2611.09001","url":"https://arxiv.org/abs/2611.09001","tags":["eess.SY","math.OC"],"score":0,"title":"Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation","domain":"eess.SY","source":"arxiv","authors":["Wei Wang","Himanshu Sharma","Thiagarajan Ramachandran"],"reviews":0,"subject":"eess.SY","summary":"Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load…","category":"research","comments":0,"disputed":false,"division":"eess","mentions":0,"discussed":0,"published":"2026-11-06","reactions":{}}