Id: arxiv/2611.09001 Url: https://arxiv.org/abs/2611.09001 Tags: eess.SY, math.OC Score: 0 Title: Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation Domain: eess.SY Source: arxiv Authors: Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran Reviews: 0 Subject: eess.SY Category: research Comments: 0 Disputed: false Division: eess Mentions: 0 Discussed: 0 Published: 2026-11-06 Page: https://delphi.science/r/arxiv/2611.09001 Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load…