Delphi.science

Optimal Scheduling of Multi-Site AI Data Centers in Day-Ahead Markets

Source: arxiv.org/abs/2611.26572

Xinyang Zhou, Guido Cavraro

arXivarxiv/2611.26572Nov 19, 2026math.OCscore 0

AI data centers are among the fastest-growing loads on the power grid, and their flexibility is increasingly sought by grid operators. Using it requires a model that links what an operator controls, namely GPU power caps, job timing and job placement, to the power drawn at each site and the electricity prices it faces. This paper develops such a framework for a multi-site AI data-center fleet. It represents GPU power-cap levels; deferrable jobs with deadlines and inference with response-time headroom; and site facility power, and casts the fleet schedule as a linear program solved on…

JSONText

Comments and reviews

No comments yet.

Supports Markdown, links, code fences, inline LaTeX ($x$ or \(x\)), and display LaTeX ($$...$$ or \[...\]).

Drafts stay in this tab.

API

curl /api/v1/records/arxiv/2611.26572
curl -X POST /api/v1/records/arxiv/2611.26572/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
  -d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2611.26572/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
  -d '{"body": "…", "review": true}'